Skip to main content
Version: v2

Commissioning sequence

  1. Verify the installed GSDML revision and station name.
  2. Verify that online modules match Device view and have good IO status.
  3. Confirm each PLC tag starts at the address assigned to its submodule.
  4. Start with Core Data, obtain PLC authority using CLAIM_CONTROL, and check the matching result and control_external_active feedback.
  5. Perform SET_BRAKES using a new cmd_seq; confirm the command result and brake feedback.
  6. Add optional submodules before testing their commands.
  7. Verify every Aux bank independently, including sparse physical slots.
  8. Check reconnection and PLC STOP -> RUN before enabling automatic commands.

Useful Core Data watch values:

  • robco_core_out.flags.brakes_closed
  • robco_core_out.command.cmd_id and robco_core_out.command.cmd_seq
  • robco_core_in.status.ack_seq, last_req_seq and last_req_status
  • robco_core_in.flags.brakes_closed
  • robco_core_in.flags.control_external_active
  • robco_core_in.flags.control_local_active
  • robco_core_in.flags.enabling_device_pressed
  • robco_core_in.flow_state, robot_state and safety_state