Commissioning sequence
- Verify the installed GSDML revision and station name.
- Verify that online modules match Device view and have good IO status.
- Confirm each PLC tag starts at the address assigned to its submodule.
- Start with Core Data, obtain PLC authority using
CLAIM_CONTROL, and check the matching result andcontrol_external_activefeedback. - Perform
SET_BRAKESusing a newcmd_seq; confirm the command result and brake feedback. - Add optional submodules before testing their commands.
- Verify every Aux bank independently, including sparse physical slots.
- Check reconnection and PLC STOP -> RUN before enabling automatic commands.
Useful Core Data watch values:
robco_core_out.flags.brakes_closedrobco_core_out.command.cmd_idandrobco_core_out.command.cmd_seqrobco_core_in.status.ack_seq,last_req_seqandlast_req_statusrobco_core_in.flags.brakes_closedrobco_core_in.flags.control_external_activerobco_core_in.flags.control_local_activerobco_core_in.flags.enabling_device_pressedrobco_core_in.flow_state,robot_stateandsafety_state